Health Hue Hub · HueRX · Prescriptions
E-prescribing software, written once and sent the right way.
Write the prescription from the patient’s record and HueRX sends it the way the rules allow for that drug and the patient’s state: e-prescribed, faxed from your clinic’s own number, or printed in the clinic to sign by hand. Controlled substances, Schedule III to V, go electronically with EPCS. Every script is tracked to the pharmacy, and refills are flagged before they run out.
your clinic’s own
electronically with EPCS
the US and Canada
01 · Writing
Written from the record, checked against the patient’s state.
Pick the drug and the directions, quantity and days’ supply fill in. Before anything is sent, HueRX checks the rules for the prescriber, the patient’s state and the pharmacy, then picks the route: fax from your clinic’s own number where fax is allowed, e-prescribing where the state requires it. When a drug can’t go a particular way, the screen says so and cites the rule, and the faxed PDF the pharmacy receives is saved to the record exactly as sent.

02 · Pharmacies
Pharmacies you add, proven before the first script.
Search the national pharmacy registry and add the retail, mail-order and compounding pharmacies your patients use. Before a prescription goes to a new fax number, HueRX sends that pharmacy a test fax with a one-time code, and the pharmacy is marked confirmed only once it reads that code back. A prescription never goes to a number that hasn’t been proven to reach that pharmacy.

03 · Controlled substances
Testosterone, phentermine and other controlled scripts, sent electronically with EPCS.
Schedule III to V prescriptions are written in HueRX with the drug, directions, quantity and pharmacy. The prescriber ticks the attestation and signs with two-factor authentication, and the prescription goes to the pharmacy electronically as EPCS. Before it goes, HueRX checks the prescriber’s DEA registration against where the patient is, and it caps refills at five. If your clinic already writes controlled scripts in another tool, HueRX can draft the order and hand it there instead.

04 · Peptides and compounded medications
Peptides and compounded medications, to the pharmacy that makes them.
Prescription peptides, compounded hormones and other compounded medications go to the licensed 503A or 503B pharmacies your clinic works with, from the same screen as any other prescription. Each order carries the strength, the directions and the supply, and it is tracked through to the refill like every other script, which suits the regular schedule most peptide and hormone patients are on.

05 · Tracking and refills
Tracked past the send, then on to the refill.
Every script shows where it is, from signed to delivered at the pharmacy. Orders handed to another prescribing tool get their own dashboard of what was drafted and never sent, what is overdue for pickup and what is due for a refill, so nothing stalls between writing a script and the patient taking it. When a patient texts asking for a refill, the request is matched to their last prescription and waits for the provider to approve or deny it. Approving checks the refills left and, for a controlled drug, the six-month limit, then drafts a new order with the same drug, directions, quantity and pharmacy.
Secure, compliant, and clinic-ready
Every feature lives in a platform built for clinics from the ground up, with charting, consent, and payments native to the patient record.
PHIPA & HIPAA-aware
Patient data is encrypted and handled to Canadian health-privacy standards.
Consent & audit
Consents, signatures, and changes log to the record automatically.
Role-based access
Granular permissions keep charts and contact details on a need-to-know basis.
One source of truth
Scheduling, payments, messages, and records in one place. Nothing siloed.
Explore more of the Hub
Prescriptions is one part of the Health Hue Hub, your AI-powered clinic operating system.
Lab Orders
Quest, Labcorp or your own lab, from the record.
Supplements
Fullscript plans, shipped to the patient.
Telehealth
Video consults, recorded to the record.
Patient Records
Every patient in one complete profile.
Consent Forms
Every form in one link, signed before the visit.
Conversations
One inbox for SMS, calls, web chat, and DMs.
FAQ
Questions about Prescriptions.
How are prescriptions sent?
Electronically, by fax from your clinic’s own number in the prescriber’s name, or printed in the clinic and signed by hand. HueRX picks the route for each prescription from the drug and the patient’s state, and shows the rule behind it.
Does it support EPCS for controlled substances?
Schedule III to V, yes. The prescriber signs with two-factor authentication and the prescription goes to the pharmacy electronically as EPCS. HueRX checks the prescriber’s DEA registration against where the patient is and caps refills at five.
Do you support peptides?
Prescription peptides compounded by licensed 503A or 503B pharmacies, yes, sent and tracked like any other prescription. Research-use-only products aren’t prescriptions and aren’t supported.
Which pharmacies can we send to?
Any retail, mail-order or compounding pharmacy in the national registry. Each one gets a test fax with a one-time code, and it is marked confirmed only once the pharmacy reads that code back.
How do refills work?
When a patient texts asking for a refill, the request is matched to their last prescription and waits for the provider. Approving checks the refills left and, for a controlled drug, the six-month limit, then drafts a new order with the same drug, directions and pharmacy. Refills coming due also show on the dashboard.
Does it work in Canada?
Yes, in Ontario, Alberta, Quebec and British Columbia. In Ontario, Alberta and Quebec prescriptions go by fax from your clinic’s number, and in British Columbia they print for the prescriber to sign.
How is it priced?
It’s included in the platform, with no per-prescriber add-on.